Mega-doors in side wall of 1,650 m² aviation building

Caverton, founded in Nigeria in 2008, has but one objective: to become the market leader in maritime and air transport logistics.

Caverton

Outside it is getting colder, but at Frisomat, today we look back on the warmest week! Today we handed over a check worth € 2,519.98 to Ayiti Cheri. A project where we, as Frisomat, already partnered up with the construction of a sports hall, was now also supported by all Frisomat colleagues. And with success!

Caverton’s needs

needs were so specific that Frisomat had to design a hall that was unprecedented in the company’s history. To provide the required manoeuvring space, a customised solution was developed. The result is a mega-door in the side wall – Frisomat’s latest innovation.

Helicopters moving in and out at lightning speed

The mega-door is 22m wide and 6.5m high. Its dimensions are such that it could not possibly be installed in the front wall, as is traditionally the case. A challenge which Frisomat converted into a stunning piece of engineering. With helicopters moving in and out at lightning speed, Caverton now has the desired flexibility. And that is what we aim for.

This site is registered on wpml.org as a development site.